Technical reference

Technical data for PeakGuard, the battery and the app, for use in project design. Final equipment and settings are stated in the proposal.

spotEQ PeakGuard

Hardware
MountingDIN rail, fanless
Operating temperature−20 °C to +60 °C
Power supply12–24 V DC or Power over Ethernet (PoE)
ProcessorARM64, four cores
Memory2 GB
Storage16 GB eMMC, two system partitions and a separate data partition
NetworkEthernet. Wi-Fi and mobile broadband optional
ClockBattery-backed real-time clock
WatchdogIn hardware
Key storageTPM 2.0 or equivalent secure element
Control
Metering and controlEvery second
SetpointValid for 30 seconds, expires unless renewed
On expired setpointHold last value, self-consumption (default) or idle
Manual overrideMax. 60 minutes, then cancelled automatically
Reporting to the cloudStatus every 5 seconds, measurements every 60 seconds
Cloud planning
Horizon48 hours
Resolution15 minutes
New planEvery 15 minutes, and on new prices, tariff changes or equipment changes
Oldest plan the unit accepts30 minutes
Short-plan warningLess than 2 hours remaining
Prices and tariff
Price sourceDay-ahead spot prices from ENTSO-E
Bidding zonesAll Norwegian bidding zones
CurrencyNOK, converted from EUR at European Central Bank reference rates
Tariff modelSupplier markup, energy charge per time period, taxes and VAT per interval
Capacity chargePrice per kW per calendar month
Sites without a registered tariffMarket price only, and the site is labelled as such
Equipment controlled
Hot water, heating and ventilationThrough the building management system (SD-anlegget). Interface agreed per project Available now
EV chargersOCPP 1.6J, the charger connects to PeakGuard Available now
BatteryInverter and meter over Modbus TCP Available now
Other process loadsLoads beyond hot water, heating and ventilation Assessed per project
Access and security
Cloud connectionMQTT over TLS
DirectionOutbound only. No open ports towards the internet
AuthenticationMutual certificate authentication, one certificate per unit
Software updatesSigned, verified before installation
Remote accessNo remote shell, no direct register writes. Equipment is controlled only through validated schedules
Local interfaceWeb interface on the unit, local network only. Used for commissioning
Local sign-inPassword unique to the unit, printed on the label
Local storage
DatabaseSQLite on the data partition
MeasurementsAt least 7 days at 60-second resolution
Events30 days
SchedulesThe current one and the last ten
Size limit500 MB, oldest measurements removed first
The PeakGuard app
Shown per siteMeasured, forecast and planned power, battery state of charge, calculated saving
AlarmsOpen, acknowledged or resolved. Email for high and critical
Site offlineWarning after 2 minutes, high alarm after 5 minutes
Measurement retention90 days
InterfaceWeb browser, nothing to install
Access controlPer organisation and site. Installer access is time-limited
APIREST, versioned
LogChanges, alarms and schedule status, with time and user

The first production units are being built. The hardware rows are the baseline every delivered unit meets. Values in grey text are settled per project. The planning, prices and app rows show the settings in use today. Alarm thresholds and retention periods in the app can be adjusted per customer.

Battery

Battery
Cell chemistryLithium iron phosphate (LFP)
Module50 kWh
System capacitySized per site, in 50 kWh modules
Battery managementIntegrated BMS, reports to the inverter over CAN
Usable depth of dischargeSet at commissioning for the selected pack
Inverter and metering
TypeBidirectional battery inverter with site metering
PhasesSingle-phase or three-phase
Site meterThree-phase meter on the main incomer
Power ratingSized with the battery, stated in the proposal
Operation
ControlspotEQ PeakGuard, every second, following the schedule from the cloud (48 hours ahead in 15-minute steps)
LimitsImport, export and equipment limits are enforced locally in the unit
SolarExisting solar production is included in the site model
Installation
EnclosureFloor-standing cabinet, for indoor or outdoor installation
Dimensions, weight and coolingStated for the selected cabinet and configuration
Certificates and datasheetsSupplied with the proposal
Scope of deliveryCabinet, inverter, meter, electrical work and commissioning

Battery and inverter are selected per site, and the values in grey text are filled in once the configuration is chosen.